Well frustrated... as my employment is getting seriously in the way of this.. more meaningful work.
Anyhow... today I spent a few hours in the Drivers / Engine bay area. The Generator was removed along with the Brake & Steering master cylinders and associated brake pipes.
The paintwork, in this area, is in really excellent condition and is cleaning up extremely well.. degreaser and a bit of "elbow grease" is all that will probably be needed... with maybe just a bit of paintwork. This is a great relief...as with the Striker restoration, all the interior had to be stripped back to bare aluminium and repainted.
So here are a few photos of todays work...
![]() |
| Still some de-greasing to do... but looking good |
![]() |
| The next job is to remove the brake calipers and check / refurbish as required. |
![]() |
| Still some adhesive, from the vinyl covering, to remove. I will probably not replace this as the white paintwork looks good |
![]() |
| Brake master cylinder removed for refurb |
![]() |
| Steering Master Cylinders removed for refurb |
![]() |
| Generator... looks worse than it is... I think a good clean up will be all that is required. |






No comments:
Post a Comment