Work and a Holiday have severely hampered progress.... so there was nothing to report..... however over the last couple of weeks work has resumed.
Front bulkhead fitted..... Fan and both belts fitted..... steering & brake hydraulics bled and checked for leaks.
Just sorting out the wiring... ignition and starter circuits working.... so all the other bits can wait. Front indicators work.... but there is no wiring to the rear end yet !
I really need to see the Sabre move under its own power so I'm concentrating on this objective. If I can drive it out and back into the garage then a big milestone will have been achieved.
So... movement is now quite close..... A) Connect all the gearbox oil pipes up B) fit radiator and coolant pipes C) Wire up the fuel pump !!
Here are photos taken today...
Belts fitted and tensioned |
All new brake / steering pipes |
Sorting out the wiring !! |